Chemistry & Chemistry Annex Renovations

Project Schedule

Chemistry and Chemistry Annex building renovation timeline

Updated 3 October 2017

Project Description

Chem & Chem Annex Fire Suppression – In Construction Drawings
New fire sprinklers and fire pump. Work in the labs will occur after hours.

Chem Seismic – In Construction Drawings
Structural corrections to the foundation and exterior walls and accessibility improvements.

Chem Annex Seismic – In Design
Structural corrections to the foundation, exterior wall and interior columns (4th and 5th floors), and accessibility improvements.

Chem Annex Seismic 2 – In Design
Seismic corrections to interior columns (Basement, 1st, 2nd, and 3rd floors).

Swing Space 1 – Alterations – In Planning
Consolidation and alteration of existing shop and storage space to provide new machine shop, stockroom, receiving, electronics shop, and conference room. Includes construction of roof enclosure over mechanical area way.

Swing Space 2 – Basement Alterations – In Planning
Basement alterations to chemistry room 014 to provide student work space to replace chemistry room 04 demolished by the Chem Seismic project.

Swing Space 4 – Admin Modular

Swing Space 5 – Lab Modular – In Planning
Installation of leased modular buildings to house administrative offices, conference rooms, teaching labs, dispensaries, a computer lab, and associated restroom facilities.

Chemistry Addition & Phase 1 Renovation – In Planning
Renovation of a portion of the 1st floor of Chemistry, a new 20,000 sf addition with new lab and office space, and improvements to primary building exhaust and electrical building systems.

Contacts

Urgent Issues:

Debbie Decker, Chemistry Safety Manager
(530) 304-6728
dmdecker@ucdavis.edu

Scott Berg, Chemistry Machine Shop
(916) 224-0295
spberg@ucdavis.edu

General Information and Construction Issues:

Design and Construction Management
Integrated Projects Group
(530) 564-8754
dcm-ipg@ucdavis.edu